Applied Technology of China hot rolled steel sheet pile for expansion

In the field of infrastructure construction, steel sheet piles from the early European pioneering application has been over a hundred years. As a modern foundation and underground engineering fields important construction materials, steel sheet pile to meet the traditional water resources, civil engineering, road traffic engineering, environmental remediation, and control of sudden-onset disasters, and many other fields of engineering construction needs. steel sheet pile products according to production process into a cold-formed steel sheet pile and two types of hot-rolled steel sheet piling. In engineering construction, cold-formed steel sheet pile narrow range of applications, most of the material as an application supplement, hot-rolledsteel sheet pile has been the leading product engineering applications. My previous years, the production and application of hot-rolled steel sheet pile is empty, as the national economy in recent years, the rapid development of U-type hot-rolled steel sheet piling has been gradually reinforced in the dike, dam cofferdam, to build a dock piers and retaining walls, and so Hydraulic engineering and construction of retaining walls, mountain slope, tectonics pit support and other infrastructure projects applied. Hot-rolled steel sheet pile Applied Technology Development in China late last century, 50 in Wuhan Yangtze River Bridge construction, the bridge from the Bureau of the Ministry of Railways to introduce from the former Soviet Union, China for the first time U-type steel sheet pile cofferdam the water used in construction of bridge pier. The next few decades, constrained by economic strength, combined with the domestic production does not have the equipment and rolling technology, with a limit on the shortage of construction machinery and construction of technological backwardness and other factors, the application of hot-rolled steel sheet piles have been at a standstill. The late 20th century, Shanghai Iron & Steel Co., Ltd. by virtue of Brahma from abroad mill production line technology and equipment conditions, the production of width 400mm, U-type steel sheet pile more than 5,000 tons, and successfully applied to the Nen River Bridge, cofferdam, New Century Shipyard, Jingjiang 300 thousand tons dock and Bangladesh flood control works and other projects. However, during the trial production of low productivity, economic efficiency is poor, low domestic demand, lack of experience and technical and other reasons, unable to continue production. According to statistics, China’s annual consumption of steel sheet pile to keep 3 million tons, accounting for only 1% of the world%, and is limited to a number of ports, terminals, shipyards, engineering and bridge building permanent cofferdam foundation pit and other temporary works. In recent years, as China’s rapid economic development, all kinds of innovative, efficient, environmentally friendly construction techniques and materials to promote the use of progressive. Because of its high-strength lightweight steel sheet pile, sealing, good durability, construction, high efficiency, small footprint, and other unique properties inherent to solve a number of large-scale construction projects of China’s construction problems. Such as Shanghai Changxing Shipbuilding Base a project, Tangshan Caofeidian Coal Wharf and other major projects, in order to provide a handy steel sheet piles, steel sheet pile construction method to obtain a practical stage of these projects covering a one-time usage million tons of steel sheet pile to obtain good economic and social benefits. In addition, the foundation pit, retaining cofferdam, the terminal building in the temporary application of a number of projects have also been tried, such as the second phase of the Pudong International Airport, the Shanghai Expo project, Hangzhou Bay Cross-sea Bridge, Wenfu Railway Project , steel sheet pile is also a larger amount of the provisional envelope. steel sheet pile construction played an important role, and to better meet our economic development, science and technology innovation, environmental protection and sustainable development needs. However, generally speaking, China’s steel sheet pile technology is still in the initial stage, the current annual consumption of steel sheet pile of about 30,000 tons, with China accounting for one-third of global steel consumption status of disproportionate, with the developed countries still exist in a significant gap, thus the production of hot-rolled steel sheet pile and applications still have a long way to go. Hot-rolled steel sheet pile application technology is very bright future as a reusable infrastructure for environment-friendly materials, hot-rolled steel sheet piling for its U-efficient, durable, simple, lightweight and an excellent cross-section sealed impermeable structure and shape, has to meet the demand for engineering structures, functional reliability, ease of use and the unique advantages such as safety and environmental protection. Compared with other workers, steel sheet pile construction with a simple construction, operation occupying a smaller space, construction, and flexible operation simple; operating speed, short construction period, suitable for the implementation of floods, landslides, subsidence, quicksand and other disasters, the rapid rescue; structure of light, Compared with other constructs, self-structure, light, bearing capacity of a strong earthquake monomer good; watertight and strong, can quickly sealing or plugging constructs, anti-infiltration and easy construction; durability is good, in a relatively poor use environment, the life expectancy of up to 50 years; construction of environmental protection, earth and concrete consumption significantly reduced the amount of the effective protection of land resources; reproducible, and can be used repeatedly in an ad hoc projects 20 to 30 second-class features. Although our application of hot-rolled steel sheet pile is still in its infancy, with a great gap between the Western developed countries, but the gap is the driving force, power bears the opportunity. For the application of advanced technology to comprehensively promote steel sheet pile used in the construction sector in China, production and design, construction and use of square together actively engaged in the cultivation of the market hot-rolled steel sheet pile, Qing Li with foreign production and application of mature technology and construction experience to lead the country sheet piling market. Based on steel sheet pile in the construction operations of the many advantages, the State General Administration of Quality Supervision, Inspection and Quarantine, the National Standardization Management Committee on May 14, 2007 issued a “U-type hot-rolled steel sheet pile” national standards, and in 2007, December 1 formally implemented. The implementation of standards on the future of China’s production and application of steel sheet pile, with milestone significance. According to market analysis and forecasting the next 10 years, China’s annual consumption of hot-rolled steel sheet pile volume is expected to more than 500,000 tons. The industry believes that the future application of hot-rolled steel sheet pile hot spots mainly in the following aspects: First, land is a non-renewable resources, but also irreplaceable, China’s agricultural production, land has always been tight, infrastructure, large-scale with soil. Has continuously shrinking land resources in the state, especially in the Yangtze River Delta, Pearl River Delta, and others much less industrialized areas, not only to develop and also highlights the contradiction between protecting natural resources, land resources, the phenomenon of tension is particularly acute. In civil engineering construction, the use of steel sheet pile can not only reduce the filling section, reducing the amount of earth filling, but also with soil conservation, protect the environment. As China continued to strengthen the management of land resources, land use, a significant increase in cost. Economically developed cities building construction, the Big Dig-style building foundation construction has been less and less, all kinds of retaining wall construction technology improvements will greatly facilitate the needs of steel sheet pile. To further strengthen the concept of conservation land, the steel sheet pile construction method of this new technology is bound to be popular and widely used. 2 is to enhance the defense capabilities of natural disasters, reduce landslide and mud-rock flow and the river floods and other natural disasters on people’s living environment and the natural environment destruction, the urgent need to improve slope protection, revetment quality grade, which is densely populated mountain and the surrounding traffic arteries of the Yangtze and Yellow rivers and other large maintenance has a special significance, using steel sheet pile construction technique can greatly reduce the filling section, reducing the amount of earth filling, save soil, these measures will lead to significant demand for steel sheet pile. Third, the next 10 to 20 years, transforming our waters and along the coastal areas of infrastructure planning has been completed the design, Jianghai large-scale development will inevitably lead to the transformation of river basins, transport investment is bound to set off a large river crossing, the bridge across the sea and the mountains building climax, Yangtze River Delta, Pearl River Delta and Bohai Rim Economic Circle continue to develop, Tangshan Caofeidian Industrial Zone construction, the development of the Yellow River estuary area and so will appear related to the economic development of China’s super-large-scale series of projects at the same time, China’s high-speed railways, inter-city light rail lines, highways and other transportation arteries State Road construction in the ascendant, construction involved in a series of technical, economic, environmental and other issues are the application of steel sheet piles provided a broad space, is bound to the future of steel piling market provide a strong support. 4 is a steel sheet pile products promulgation and implementation of national standards for the production of manufacturers and provide customers with a good technical support. As China’s steel rolling a number of modern technological equipment for production runs, a number of development and production of hot-rolled steel sheet pile with the hardware capabilities of the large-scale iron and steel enterprises, has been tracking sheet piling market development, expected next 5 to 10 years, China will form a large heat U-rolled steel sheet piling production capacity for our construction projects to ensure the provision of adequate supplies. We are at a historical period of economic development, as China’s rapid economic development, greatly increased economic strength, infrastructure to flourish. Developed countries, economic development, experience has shown that in a period of rapid economic development in China, the geographical distribution of a wide complex geological structure, with applications specific steel sheet pile and wide-ranging needs of the emerging infrastructure for our hot-rolled steel sheet pile applications a very wide space. Despite the current hot-rolled steel sheet piles in China’s market situation and a decade ago, very similar to H-beam, China’s hot-rolled steel sheet pile production and application development, there is still a long way to go, but we are convinced that today’s hot-rolled H-beam applications must be will be clear to the U-type hot-rolled steel sheet pile applications, a better tomorrow.

 

Posted in Sheet Pile Application | Leave a comment

Basic knowledge of sheet pile

Sheet pile is a hot or cold rolled structural shape with interlocks on the flange tips. The interlocks permit individual sections to be connected in order to form a continuous steel wall which is earth tight and virtually water resistant.

Steel sheet pile is a top choice in water retention systems, particularly with cofferdams, port & harbors, locks & dams and flood protection. It is also excellent for retaining soils that are below the water table. It will maintain its shape during installation.
Steel sheet piling is environmentally friendly. In addition to being produced with recycled steel the Sheet pile are installed in manner that produces no spoils. Therefore there is no risk of exposure and disposal of potentially hazardous or contaminated materials.

There are many reasons to use sheet piling. Because it is readily available and transportable, and it is in many cases a fast and economical solution to an owner’s need for a durable, long lasting wall system. For permanent construction, some uses include retaining walls, bulkheads, bridge abutments, graving docks, cut-off walls, mooring dolphins and pier protection cells. Temporary structures would include cofferdams used to construct building excavations, trenches, piers for bridges, and lock & dams on our inland river system.”>Basic knowledge of sheet pile

Sheet pile is a hot or cold rolled structural shape with interlocks on the flange tips. The interlocks permit individual sections to be connected in order to form a continuous steel wall which is earth tight and virtually water resistant.

Steel sheet pile is a top choice in water retention systems, particularly with cofferdams, port & harbors, locks & dams and flood protection. It is also excellent for retaining soils that are below the water table. It will maintain its shape during installation.

Steel sheet piling is environmentally friendly. In addition to being produced with recycled steel the Sheet pile are installed in manner that produces no spoils. Therefore there is no risk of exposure and disposal of potentially hazardous or contaminated materials.

There are many reasons to use sheet piling. Because it is readily available and transportable, and it is in many cases a fast and economical solution to an owner’s need for a durable, long lasting wall system. For permanent construction, some uses include retaining walls, bulkheads, bridge abutments, graving docks, cut-off walls, mooring dolphins and pier protection cells. Temporary structures would include cofferdams used to construct building excavations, trenches, piers for bridges, and lock & dams on our inland river system.

Posted in Sheet Pile Application | Leave a comment

MOBILIZATION: 12-foot pile up, get to the point of dredging Norriego

The plant fils approved the bids submitted and the funding in place – what do PAHO Quebec remains Norriego point is to mobilize the dredger and the Installation of the temporary sheet pile wall.

“We will do this as fast as we can,” said the Head of Public Services Steve Schmidt. “We are waiting to be sorted and materials in.”

With its state of emergency in place, the city has been working feverishly State of The Last Days, Rain idées couple of temporary solutions to tame l’Erosion continues along Norriego Point, at the same time finding a way to the clean navigation channel knot fr Throat.

In City Council Tuesday Night Reunion, The City Leaders unanimous vote by the UN approval l’Boat Project-based Hydraulic Dredge joins Matthew through Marine Inc. for $ 142,350 Amount nicht. The contract would be for a “single payment” of work, which means that the city pay the same amount if soi dredge above or below a certain amount of-Szene. In this case the number is about 15.000 cubic-U-Bahnen.

With a split vote, agreed 5-1, with Councilman Dewey Destin vote against joining two UN reach agreement with Training and Rental Inc Flèche Install piling fr What The Wall ILC run des Tartes 1.120 Total links over point. This contract will cost the city $ 89,600.

In total, the sheet piling and dredging the navigation channel, the city will spend 235.950 dollars einer This temporelle Project, Which is more of a Measure provisoire Until the city can go ahead with its much larger project stabilization Wall More which was recently approved.

Pieces of the Wall remain soi of 12 meters, but only six inches of the pile of leaves will Sichtbar from above the scène for the time put Quebec in its place.

Posted in Sheet Pile Application | Leave a comment

Cato’s Bridge Beach Access questioned as erosion permitting nears

A modified erosion-busting project is within months of final approval, but some residents still want the state to stop moving forward.

The Palm Beach County Jupiter Inlet Lighthouse Outstanding Natural Area project is aimed at protecting the area which includes the area known as Cato’s Bridge Beach by the Jupiter Lighthouse from erosion.

The Florida Department of Environmental Protection has been coordinating with the Palm Beach County Environmental Resources Management division to build a three-tiered sheet pile system along 705 linear feet to stabilize the eroding bluff.

Meanwhile, the application for JILONA is complete.

“Final action on the JILONA project application will be taken by the department within 90 days,” said Cristina Llorens, of Southeast District of the Florida DEP. The applicant — PBCERM — said the DEP has until March 20 to take final action, which includes issuing a permit.

“Once DEP issues a permit, the permitting process would then shift to the Corps of Engineers. After both the state and federal permits are ‘in-hand,’ we would pursue funding opportunities then initiate the bid process for construction,” said Michael Stahl, senior environmental analyst with PBCERM.

Stahl said the county has, in fact, completed a design modification “to remove sections of the rock breakwaters along the north 192 feet of the project shoreline.” This modification was submitted on Jan. 20.

Walter Franklin, a Jupiter resident who was involved in the citizen movement to stop the project, has said the sheet pile wall still will block public access from Cato’s Bridge Beach.

Franklin said he is concerned with county engineers’ design because so much is at stake in regards to the public’s access of a beach that so many families have enjoyed through the years. He cited recent renovated docks in Jupiter.

“They had to close the docks because people were complaining they were built too high. Now (the county) has to put in ladders and bumpers for boats to dock there to the tune of $15,000,” Franklin said. “These docks can’t be used until they put the $15,000 ‘Band-Aid’ on it.”

Franklin said at public meetings discussing the JILONA plan, county engineers have pointed to these docks as a “success.”

“These are the same designers for the Cato’s Bridge Beach plan. (The docks) are not well designed and there are serious flaws with it. It raises questions.”

Tequesta resident and Martin County Commissioner Patrick Hayes said the plan raises his concerns, too.

Hayes and many other residents have fond memories of docking their boats and having a fun-filled picnic with their families in the area, he said. Now that may be a thing of the past.

“An alternate plan was resubmitted to the DEP; they agreed to open 125 feet. However, part of that 125 feet has stones on the shoreline. They’re going to break it into sections,” Hayes said.

“You can’t get very many boats in a 20-foot opening, last time I checked,” Hayes said, adding that the project is unnecessary.

“That part of the beach is not eroding. It looks like they want to eliminate the beach and have a mangrove shoreline; to force manatees to a more congested channel. A number of people are concerned that this will force manatees to be in greater competition with boaters.”

Hayes speaks to many residents indicating their opposition to the JILONA project as reflected in the Save Cato’s Bridge Beach Facebook page, which currently has 1,567 “friends,” he said.

“I haven’t had anyone say to me that I’m on the wrong side of this issue,” Hayes said. “(The county) just wants to chase the public away (from Cato’s Bridge Beach).”

A number of people are interested in legally challenging the county plan but cannot until the permit is issued. Until then, “we’ll see,” he said. For more information, visit https://www.facebook.com/savecatosbeach?sk=wall.

Palm Beach County Commissioner Karen Marcus said Monday she still supports the JILONA plan, regardless of some not seeing the need for the stabilization.

“There is definitely erosion. It definitely needs to be stabilized. I support stabilization of the shoreline,” Marcus said.

Posted in Sheet Pile Application | Leave a comment

2012: Pursue A Great Leap

With a large export volume in the year 2011, Shunli has undoubtedly got the first place in the field of exporting sheet piles in China. Excellent quality , competitive price, thoughtful service, high efficient management and professional staffs have leaded the company to the first place. Many clients came to Shunli’s factory and spoke highly of the products and service. In the new year 2012, several new production lines for sheet piles will be assembled and thus the production capability will be larger than ever. Delivery time will not be an obstacle when we have abundant orders.

In the new year 2012, Shunli will not only try its best to keep the first place in exporting sheet piles, but broaden its mainland market. More technicians have been employed. Many sales acquiring minority languages have also been empolyed in order to open new market in the world. Shunli will stick to product quality, service and creativity, meeting requirements of the clients from all over the world !

On the road to success, Shunli Group never stop!

Posted in Sheet Pile Application | Tagged , , | Leave a comment

Unprecedented: 30m Larssen Sheet Pile Cofferdam Project in China

Ying River Bridge, located in Fuyang city China, is one of projects of Fuyang-Liu’an railway. In the deep pile foundation construction of main pier No.46 and No.47, it used 30 meters long larssen sheet pile which causes an unprecedented length of sheet piles in China sheet piling cofferdam project. Recently, Shanghai Railway Bureau in Hefei China held a technical summary of this steel sheet pile cofferdam and celebrated its success and breakthroughs.

30m Larssen Sheet Pile by China Shunli Steel Group

Bridge Information

The bridge with 5540.16m in full length is the main river channel across the junction of the country. The main span is designed to use a joint of 70+120+70 m continuous beam with variable cross-section. The main pier No.46 and No.47 of main span located in the main channel of Ying River are designed to use 20 φ2.0m group pile foundation with 83m and 86m long. The bridge involving in deep water pile foundation, end pile bearing platform, piers bit high and large span is the key and safety construction in Fuyang-Liu’an railway project.

Why 30m Long Larssen Sheet Pile

Firstly, larssen sheet piling has alot of advantages like  fast speed of construction,feasible and safe, high efficiency,low cost, obvious and good sealing effect and so on.

Secondly, as the bridge project is under tight construction schedule requiring high technology, the construction is very difficult in normal way. So by experts and professors’ brainstorming, they decided  to use  larssen sheet pile as the preferred solution in this bridge’s deep pile foundation and bearing platform construction.

The project uses imported Larssen IV type steel sheet pile, the cofferdam is designed as  28m*24m size in  rectangle plane, so we can use steel cofferdam, internal support and steel columns in the middle to form a system to enhance the stiffiness of steel sheet piles. In addition, according to the structural design of steel sheet piling cofferdam, the maximum cantilever length of sheet piles is up to 19.5m,  the cantilever length of sheet piling in the end bearing platform is also up to 17m, so the experts group decided to set length of steel sheet pile as 30 meters.

Posted in Sheet Pile in China | Tagged , , , , | Leave a comment

Why Cold Formed Sheet Pile

The sheet pile manufacturing process involves forming the material by either cold formed or hot rolled (press-braking) way to achieve the desired shape.

When steel is formed by press-braking or cold rolled forming, there is a change in the mechanical properties of the material by virtue of the cold working of the metal. When a steel section is cold-formed from flat sheet or strip the yield strength, and to a lesser extent the ultimate strength, are increased as a result of this cold working, particularly in the bends of the section.

Cold formed sheet piles offer many advantages, such as :

1. High strength and stiffness
2. Light weight
3. Ease of prefabrication and mass production
4. Fast and easy erection and installation
5. Substantial elimination of delays due to weather
6. More accurate detailing
7. Non shrinking and non creeping at ambient temperatures
8. No form-work needed
9. Uniform quality
10. More economical
11. Easier to transport

One of the major advantages cold formed steel has over hot-rolled steel is that: with cold formed steel any desired shape can be molded out of the sheets. This makes it possible for the sheet piles to be manufactured to the exact requirements of the customer.

Posted in Sheet Pile FAQ | Tagged , , | Leave a comment

Three Sheet Pile Removal Points

During the backfilling process in pit foundation , we have to remove those driven sheet piles for repeated use after dressing in the future. In sheet pile removal, there are three very important points we must pay attention to.

1. Removal Time

Sheet pile removal will generate some vibration. Too much soil put out will cause soil displacement and ground subsidence resulting in unpredictable consequences. So for end-closed sheet pile wall, the starting point of removal should be 5 piles away from corner pile, if necessary use removing method by intervals of some piles. If the condition permits, use vibratory hammer to pile again to reduce soil adhesive force.

2. Removal Order

The order of sheet pile removal should be in the reverse order from pile driving.

3. Pile Hole Treatment

For pile holes left in sheet pile removal, it is necessary to timely backfill to reduce the impact on nearby buildings, we can use the method of removing sheet pile while filling sand or concretes.

In addition, in order to effectively remove all sheet piles, when in pile driving construction we should make a detailed record and investigation on each case. By the records, we can determine the difficulty degree for each pile removal. In the product protection for sheet pile’s recycling, all sheet piles pulled out should be promptly removed sediment and coated with oil, and straightened for piles with larger deformation. Complete sheet piles that in good condition should be transported out of construction site in time and stacked on a flat ground.

Sheet Pile Wall constructed by largest China sheet pile manufacturer-Shunli Steel Group

Posted in Sheet Pile FAQ | Tagged , , | Leave a comment

Three Typical Sheet Pile Driving Methods

1. Single Pile Driving Method

From one of corners of sheet pile walls, drive the pile one by one until the end of the project. This method is convenient, fast and does not require auxiliary support, but pile easily incline during driving, and the error accumulation is not easy to correct.

2. Screen-Piling Method

Put 10~20 sheet piles in rows into the leading guide or frame to shape it like a screen wall, then pile driver play back and forth, first drive both ends to the required depth, then pile the middle sheet piles sequentially. This method prevents the sheet pile’s larger inclination by reducing the tilt error accumulation, and easy to close up after construction. But its drawback is that construction process is a bit slow, and need the erection of a higher pile frame.

3. Piling by Waling Piece Method

At a certain height on the ground some distance from the axis, firstly build single or double layers of circle waling pieces as bracing system, then insert sheet piling one by one inside. When four corners are closed up, gradually drive sheet piles block by block in steps’ way to the designed elevation. This approach ensures flat size of sheet pile wall, squareness and flatness, it is suitable for occasions requiring higher precision, fewer pile amounts. The disadvantage is the complexity and slowness in construction, and it requires shaped sheet pile in wall closure.

Posted in Sheet Pile Wall | Tagged , | Leave a comment

Steel Sheet Pile Pit-Retaining Structure Design Classification

Design of steel sheet pile retaining structure in foundation pit can be divided into the following three categories:

1. Cantilever Support Structure – when the excavation is not very deep, the cantilever support structure can be used to block soils behind the wall.

2. Single Support Structure – when the excavation depth is larger, to ensure the retaining structure safety and reduce distortion, often set a support or an anchor near the top of the supporting structure.

3. Multi-support Structure – when the excavation depth is large, we can set multi-layers of support or anchors.

Design Contents of Steel Sheet Pile Retaining Structure

1. Select the sheet pile type and model cross-section;

2. Calculate and check sheet pile insertion depth, cross-section strength and deformation;

3. Consider the corresponding precipitation plan and its impact on the surrounding environment (including the vibration impact in pile recycling or removing)

Posted in Sheet Pile FAQ | Tagged , | Leave a comment